This page will explain the best practices for loading a van using both the cart and hand method. It will also explain loading cabinets, drawers, specialty items, hardware, and accessories. By following these steps, all materials are expected to be organized and secured in the van, ready to be transported safely.

Page Contents

Skill Requirements

...


Process Steps
Loading the Van (Cart Method)
Loading the Van (Hand Method)
Loading Full Cabinets
Loading Drawers, Glass, Specialty Items
Loading Accessories
Related Training Materials
Final Steps & Delivery
Certification
Terms & Definitions

...

Anchor
Skill-Requirements
Skill-Requirements
Types of Installation:

...

Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton,

...

Martha Stewart

...

Installer Level Required:

...

Jr. Apprentice Installer

...

Products Required:

...

TFL Material, Accessories, Special Order

...

Back to top

...

Anchor

...

Installation-

...

Steps

...

Installation-

...

Tools Required

Image Removed

Tool #1

Image Removed

Tool #2

Image Removed

Tool #3

Tool #4

Tool #5

Tool #6

Tool #7

Tool #8

Tool #9

Hardware Required

Image Removed

Hardware #1

Image Removed

Hardware #2

Image Removed

Hardware #3

Hardware #4

Hardware #5

Hardware #6

Back to top

...

Steps

Anchor
Loading-Cart
Loading-Cart
Loading the Van (Cart Method)

Anchor
Loading-Hand
Loading-Hand
Loading the Van (Hand Method)

Anchor
Loading-Cabinets
Loading-Cabinets
Loading Full Cabinets

Anchor
Loading-Specialty
Loading-Specialty
Loading Drawers, Glass, Specialty Items

Anchor
Loading-Accessories
Loading-Accessories
Loading Accessories

Back to top

...

Related Training Materials

Link #1
Link #2
Link #3

Back to top

...

Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery

Final Steps & Delivery

Back to top

...

Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

Loading the van (Cart Method):

  1. The sled/cart has been located in the shop/warehouse.

  2. The sled/cart has been reviewed to ensure all key components are included (partitions, shelves, drawers/doors, countertops, accessories, hardware)

  3. If applicable: Missing parts were identified and communicated for replacement.

  4. All parts and hardware for the job are loaded and secured in the van.

Loading the van (Hand Method):

  1. The job components have been located in the shop/warehouse.

  2. The job components have been reviewed to ensure all key components are included (partitions, shelves, drawers/doors, countertops, accessories, hardware)

  3. If applicable: Missing parts were identified and communicated for replacement.

  4. All parts and hardware for the job are loaded and secured in the van.

Loading Full Cabinets:

  1. The cabinets have been located in the shop/warehouse.

  2. The cabinets have been inspected for damage (front, back, sides, corners, hinges)

  3. If applicable: Damaged parts were identified and communicated for replacement.

  4. Cabinets have been loaded and secured in the van.

Loading Drawers/Glass:

  1. All drawers or specialty items have been located in the shop/warehouse.

  2. All drawers or specialty items have been loaded in the van with protection.

  3. All drawers or specialty items have been secured in the van for transport.

Loading Accessories:

  1. All accessories have been located and are accounted for according to the BOM.

  2. All accessories have been organized separate from TFL or specialty materials.

  3. All accessories have been loaded and secured in the van.

Back to top

...

Anchor
Terms-&-Definitions
Terms-&-Definitions
Terms & Definitions

BOM

Bill of Materials; the parts list for the job

Elevation

The CAD Design Plan created by the Design Consultant with the client.

Back to top