Status | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
...
Anchor | ||||
---|---|---|---|---|
|
The individual responsible for operating the forklift will load the job cart/sled into the van.
Example of Job Cart/Sled
Anchor | ||||
---|---|---|---|---|
|
Use the last-in, first-out methodology.
Load items from left-to-right across the floor of the van.
Load partitions and long items on the left, and continue with shorter items to the right.
Left-to-right loading in van
If stacking items is necessary, lay a blanket or protective material down before stacking each row.
The hand-loading method should be used if the cart/sled method is not possible, or for any materials that do not fit in a job cart/sled.
Anchor | ||||
---|---|---|---|---|
|
Load drawer boxes.
Ensure there is enough space in the van based on the number of drawers on the job.
Drawers should be loaded flat (see table below for definition), with a blanket between the drawer and any material below.
Drawers in a Job Cart/Sled | Create a flat surface by laying similar size material together. Lay a blanket on top of the cart/sled and lay the drawers flat on top of the blanket. |
Drawers Hand-Loaded | Create a flat area in the van and place a blanket down. Load the drawer boxes flat in the area. |
Drawer Box Loading Definitions
Drawer Boxes loaded in a job cart/sled
Drawer Boxes hand-loaded
If the installation is a multi-day install, bring drawer boxes separately on Day 2+, as needed.
Secure materials, preferably using ratchet straps. Ensure they are not moving or rubbing together during transit.
Load glass materials.
Assess the vehicle and ensure there is enough room for safe transport.
If there is not, a second vehicle may be needed.
Place glass between TFL parts from the job. This can be in the job cart/sled, or directly in the van. This will help protect the glass from breaking.
If the glass is a larger size (ie. Countertop or panel), consider a second vehicle or ensure it is loaded in a location where it can not fall or have anything fall against it.
Secure the glass and ensure it will not move or have anything fall against it.
Glass placed between TFL parts
Anchor | ||||
---|---|---|---|---|
|
Double check accessories and make sure you have the correct amount and type of each accessory.
Load accessories in a box or location where they will not be lost or damaged during transport.
Keep accessories separated by space.
Load hardware box and tools.
Check your stock of screws in your tool box.
Ensure you have a touch-up kit in the van.
Ensure you have enough runners and blankets.
Refill any screws you are low on, and ensure you have enough hardware for the upcoming installation.
If you have allowed for any tools to be borrowed, ensure you have received them back, or return any tools you may have borrowed.
Perform a final check to ensure you have all tools and hardware needed for the day.
Perform the introductory call to the customer to advise you are on the way and your estimated time of arrival.
Prepare to leave for the installation. If multiple vans are going to the jobsite, coordinate any stops along the way, parking upon arrival, etc.
Hardware box and tools loaded
...
Anchor | ||||
---|---|---|---|---|
|
Arrival Expectations
Van Stocking
CC360: A Day in the Life of a Jr. Apprentice (Link to be Added)
PPE Matrix
...
Anchor | ||||
---|---|---|---|---|
|
...
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps: Loading the van (Cart/Sled Method):
Loading the van (Hand Method):
Loading Drawers/Glass:
Loading Accessories:
|
...