Anchor | ||||
---|---|---|---|---|
|
This page explains the steps to take for installing a wrap panel. Prior to beginning the installation, ensure you completed all steps of hanging system rail and prepping partitions.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Terms & Definitions
Anchor | ||||
---|---|---|---|---|
|
Installer Level Required: Apprentice Installer
Products Required: TFL Material
Anchor | ||||
---|---|---|---|---|
|
Measuring Tape
18-Gauge Nail Gun
Clamp
Countersink Bit
Hardware Required
18-Gauge 1 1/4” Nails
18-Gauge 1 1/2” Nails
18-Gauge 2” Nails
1 1/4” x #8 Screws
1 5/8” x #8 Screws
2” x #8 Screws
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance. |
Locate all materials. Wrap panels can be single pieces or multiple pieces in a stack.
If you are completing a multi-stack, pay close attention to the elevation to understand the orientation. If it is not clear, speak with the design consultant or your install manager for clarification.
Dry fit the pieces to ensure all dimensions are correct and review where the attachment points are. Note where all shelves are located on the partition.
Beginning from the bottom, place the partition on top of the first wrap panel.
Expand | ||
---|---|---|
| ||
|
Attach the panel by nailing from the partition into the panel.
Expand | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||
|
Multi-Stack Only: Place the next panel under the partition and follow step 5 to secure it in place.
Ensure all nail holes are touched up.
Complete the remainder of the system skeleton.
Anchor | ||||
---|---|---|---|---|
|
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Anchor | ||||
---|---|---|---|---|
|
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps:
|
Anchor | ||||
---|---|---|---|---|
|
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
Dry Fit | Holding material or accessory in its intended location to test size accuracy. |