This page explains the steps to take for installing LOOX5 lighting. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton. There should be no backing pieces installed in the system at this time.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Anchor
Skill-Requirements
Skill-Requirements
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton

Installer Level Required: Journeyman Installer

Products Required: TFL Material, Accessories, Special Order

Back to top


Anchor
Tools-&-Hardware
Tools-&-Hardware
Tools Required

Tool #1

Tool #2

Tool #3

Tool #4

Tool #5

Tool #6

Tool #7

Tool #8

Tool #9

Hardware Required

Hardware #1

Hardware #2

Hardware #3

Hardware #4

Hardware #5

Hardware #6

Back to top


Anchor
Installation-Steps
Installation-Steps
Installation Steps

Panel
panelIconId1f9ba
panelIcon:safety_vest:
panelIconText🦺
bgColor#FFFAE6

Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Test the light functionality.

Expand
titleClick for more information
  • Connect the distribution box to an outlet and plug the light into the distribution box.

  • If the light is not functioning according to standard quality, contact the shop or warehouse to inquire about a replacement light.

  1. With all fixed shelves (including those with lighting) installed, allow leads to fall to their respective distribution box location.

Expand
titleClick for more information
  • The leads should travel the shortest distance along the top or bottom fixed shelf to the nearest distribution box.

  • Refer to local building codes for accessibility requirements when placing distribution boxes and drivers as they should be hidden from eyesight but still accessible.

  • Depending on the length of space between the light and distributor, extra leads may be required.

  1. Plug the leads into one of the distributor’s slots.

Expand
titleClick for more information
  • Ensure the connection is functioning by connecting the distributor to the driver and power source.

  • Ensure you are not overloading the distributor by connecting too many light leads.

  • Follow the wattage calculations completed by plan review.

  1. Attach the switch lead to the distribution box and ensure the switch is functioning according to its abilities.

If one receiver is controlling multiple switches, you must use a switch splitter to plug in the respective switches.

  1. Attach the switch to the system in accordance with the system’s elevation.

If the customer has opted to control the lighting by their internal wall switch, test the switch to ensure it is controlling the driver's power.

  1. Repeat steps 2 and 3 for all components containing LOOX5 lighting.

  2. Repeat steps 4 and 5 for all switches.

  3. Complete the set up of the Connect Mesh network, if applicable.

  4. Install all backing panels, and complete the remainder of the installation in accordance with the system’s elevation.

Back to top


Anchor
Related-Training-Materials
Related-Training-Materials
Related Training Materials

Skeleton Fundamentals
360Share Lighting Channel
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix

Back to top


Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery
Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.

Back to top


Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

Back to top


Anchor
Tips
Tips
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Panel
panelIconId1f5e3
panelIcon:speaking_head:
panelIconText🗣️
bgColor#DEEBFF

Click here to submit your own tip from the field.

Back to top


Anchor
Terms
Terms
Terms & Definitions

BOM

Bill of Materials; Parts List

Distribution Box

Box that plugs into the Driver which light leads and
switches plug into for connection.

Driver

Source of power for the distribution boxes and lights.

Elevation

The CAD Design Plan created by the Design Consultant
with the client.

Lead

The cord connecting the light to the distribution box.

Back to top


Anchor
BOM
BOM
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

DRI

Light Driver

LBB

Wireless Lighting Bus Bar

LI

Light

LIR

Light Remote

LMB

Mesh Box

LP

Light Additional Parts

PK

Puck Light

PSW

Program Light Switch

RB

Ribbon Light

Text Note

Lighting Parts

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Back to top