Certification Steps: Hanging System Rail (Drywall, Plaster): Studs have been located for the length of the rail. Toggle spots have been located for the length of the rail. There is a screw or toggle every 16” along the length of the rail; and within 3 holes on a side of each partition. Rail is secured tight to the wall. Rail is hanging level on the wall. Rail cover is wiped down and the floor underneath is vacuumed. Rail cover is installed with seams hidden behind partition(s).
Hanging System Rail (Concrete & Cinderblock): There is a tapcon screw every 16” along the length of the rail; and within 3 holes on a side of each partition. Rail is secured tight to the wall. Rail is hanging level on the wall. Rail cover is wiped down and the floor underneath is vacuumed. Rail cover is installed with seams hidden behind partition(s).
Hanging System Rail (Steel Studs): Toggle spots have been located for the length of the rail, maximizing number of studs. There is a toggle every 16” along the length of the rail; and within 3 holes on a side of each partition. Rail is secured tight to the wall. Rail is hanging level on the wall. Rail cover is wiped down and the floor underneath is vacuumed. Rail cover is installed with seams hidden behind partition(s).
|