This page explains the steps to take for installing top and bottom decorative treatments on a system. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Bottom Cap
Top Cap
Toe Kick
Faceplate
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Anchor | ||||
---|---|---|---|---|
|
Installer Level Required: Apprentice Installer
Products Required: TFL Material
Anchor | ||||
---|---|---|---|---|
|
Measuring Tape
Multi-Tool
18-Gauge Nail Gun
Drill Driver/Impact Drill
Circular Saw
Pencil
Clamp
23-Gauge Nail Gun
Hardware Required
18-Gauge 1 1/4” Nails
#8 x 1 1/4” Screws
23-Gauge 1 1/4” Nails
Anchor | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance. |
Double check measurements of the bottom shelf and bottom cap. Align the route in the top of the bottom cap with the VBs on the bottom shelf.
Expand | ||
---|---|---|
| ||
|
Dry fit the bottom cap.
Expand | ||
---|---|---|
| ||
|
Place the bottom cap below the bottom shelf and clamp it into place.
Using an 18-gauge nail gun, place 1 1/4” nails from the bottom shelf into the bottom cap to secure it into place.
Place 1 1/4” screws from the bottom fixed shelf into the bottom cap. Screws should be placed at each partition.
Expand | ||
---|---|---|
| ||
|
Screws must always be used to secure a bottom cap. Using only nails will not suffice.
Cover the screws with fast caps or wax them.
Ensure the bottom cap is secure.
Expand | ||
---|---|---|
| ||
|
Anchor | ||||
---|---|---|---|---|
|
Double check measurements of the width of the system and the top cap.
Dry fit the top cap.
Expand | ||
---|---|---|
| ||
|
Place the top cap in position.
Attach the top cap.
Expand | ||
---|---|---|
| ||
|
Touch up nail holes.
Anchor | ||||
---|---|---|---|---|
|
If Applicable:Prepare the partitions with a Rafix pin for the toe kick.
Once the system skeleton has been completed, place the toe kick according to the elevation.
Expand | ||
---|---|---|
| ||
|
Secure the toe kick in place.
Expand | ||
---|---|---|
| ||
|
Touch up nail holes.
Anchor | ||||
---|---|---|---|---|
|
If Applicable:Prepare the partitions with a Rafix pin for the faceplate.
Once the system skeleton has been completed, place the faceplate according to the elevation.
Expand | ||
---|---|---|
| ||
|
Secure the faceplate in place.
Expand | ||
---|---|---|
| ||
|
Touch up nail holes.
Anchor | ||||
---|---|---|---|---|
|
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Anchor | ||||
---|---|---|---|---|
|
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps: Bottom Cap:
Top Cap:
Toe Kick/Faceplate:
|
Anchor | ||||
---|---|---|---|---|
|
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Click here to submit your own tip from the field.
Anchor | ||||
---|---|---|---|---|
|
BOM | Bill of Materials; Parts List |
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
Dry Fit | Holding material or accessory in its intended location to test size accuracy. |
Anchor | ||||
---|---|---|---|---|
|
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
BC | Bottom Cap |
FP | Faceplate |
FSCTC | Fascia Top Cap |
KP | Kickplate |
TK | Toe Kick |
TC | Top Cap |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.