Table of Contents
Apprentice to Journeyman Installer

Status
colourGreen
titlelive
Anchor
Top
Top

This page explains the steps to take for installing top and bottom decorative treatments on a system. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Bottom Cap
Top Cap
Toe Kick
Faceplate
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Anchor
Skill-Requirements
Skill-Requirements
Types of Installation: Off-the-Floor

Installer Level Required: Apprentice Installer

Products Required: TFL Material

Back to top


Anchor
Tools-&-Hardware
Tools-&-Hardware
Tools Required

Measuring Tape

image-20240223-144446.png

Multi-Tool

image-20240223-144606.png

18-Gauge Nail Gun

Drill Driver/Impact Drill

image-20240227-150941.png

Circular Saw

image-20240223-144716.png

Pencil

image-20240223-145340.png

Clamp

image-20240613-141730.png

23-Gauge Nail Gun

Hardware Required

image-20240223-144800.png

18-Gauge 1 1/4” Nails

#8 x 1 1/4” Screws

image-20240223-144800.png

23-Gauge 1 1/4” Nails

Back to top


Anchor
Installation-Steps
Installation-Steps
Anchor
Bottom
Bottom
Bottom Cap

Panel
panelIconId1f9ba
panelIcon:safety_vest:
panelIconText🦺
bgColor#FFFAE6

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Double check measurements of the bottom shelf and bottom cap. Align the route in the top of the bottom cap with the VBs on the bottom shelf.

Expand
titleClick to view visuals and more information
  • Measure the distance from the back of the bottom fixed shelf to both cams.

  • Measure the distance from the back of the bottom cap to both drilled holes. These should be the same measurement as the cam locations on the bottom fixed shelf.

  • If they are not the same: Rotate the bottom cap and check the measurements again. If there is still an issue, use a multi-tool to extend the hole in the bottom cap so the Cam will fit inside. A final option is to replace the piece entirely.

  1. Dry fit the bottom cap.

Expand
titleClick to view visuals and more information
  • Ensure the board fits along the bottom of the system with the appropriate overhang on the sides and front (refer to the elevation for placement).

  • If the bottom cap needs to be cut down in size, make the appropriate mark in pencil and cut it to size using a circular saw.

  • Dry fit again to ensure the bottom cap is the correct size.

  1. Place the bottom cap below the bottom shelf and clamp it into place.

  2. Using an 18-gauge nail gun, place 1 1/4” nails from the bottom shelf into the bottom cap to secure it into place.

  3. Place 1 1/4” screws from the bottom fixed shelf into the bottom cap. Screws should be placed at each partition.

Expand
titleClick to view visuals and more information
  • Alternate placing them in the front and back of the partition along the length of the system.

Screws must always be used to secure a bottom cap. Using only nails will not suffice.

  1. Cover the screws with fast caps or wax them.

  2. Ensure the bottom cap is secure.

Expand
titleClick to view visuals and more information
  • There should be no gap between the bottom shelf and the bottom cap.

  • If there is a gap: A Cam may be pressing on the board due to the hole not being deep enough or in the right place. A screw can be used to tighten the gap.

  • If the gap is still visible, the bottom cap will need to be removed and the hole for the Cam will need to be extended or deepened using the multi-tool.

Back to top

Anchor
Top-Cap
Top-Cap
Top Cap

  1. Double check measurements of the width of the system and the top cap.

  2. Dry fit the top cap.

Expand
titleClick for more information
  • Ensure the board fits along the top of the system with the appropriate overhang on the sides and front (refer to the elevation for placement).

  • If the top cap needs to be cut down in size, make the appropriate mark in pencil and cut it to size using a circular saw.

    • Dry fit again to ensure the top cap is the correct size.

  1. Place the top cap in position.

  2. Attach the top cap.

Expand
titleClick for more information
  • Using an 18-gauge nail gun, attach the top cap with 1 1/4” nails.

  • When possible, nail from the top down into the fixed shelf.

    • If the ceiling height does not allow, or if the top cap material is thicker than 3/4”, nail from below the fixed shelf up into the top cap.

  • Place a nail in each corner.

  • Place a nail in the front and back of the top cap every 12”.

  1. Touch up nail holes.

Back to top

Anchor
Toe-Kick
Toe-Kick
Toe Kick

  1. If Applicable:Prepare the partitions with a Rafix pin for the toe kick.

  2. Once the system skeleton has been completed, place the toe kick according to the elevation.

Expand
titleClick for more information
  • The toe kick may be flush or inset.

  • If the partitions were drilled for Rafix pins, the toe kick should sit against these pins.

  1. Secure the toe kick in place.

Expand
titleClick for more information
  • Using a 23-Gauge nail gun, place 1 1/4” nails every 6-8” from the bottom shelf down into the toe kick.

  • Place 1-2 nails on the side of each partition into the toe kick.

  • Use a pry bar or flat bar to lift the toe kick up to the shelf to ensure a tight fit.

  1. Touch up nail holes.

Back to top

Anchor
Faceplate
Faceplate
Face Plate

  1. If Applicable:Prepare the partitions with a Rafix pin for the faceplate.

  2. Once the system skeleton has been completed, place the faceplate according to the elevation.

Expand
titleClick for more information
  • The faceplate may be flush or inset.

  • If the partitions were drilled for Rafix pins, the faceplate should sit against these pins.

  1. Secure the faceplate in place.

Expand
titleClick for more information
  • Using a 23-Gauge nail gun, place 1 1/4” nails every 6-8” from the top fixed shelf up into the faceplate.

  • Place 1-2 nails on the side of each partition into the faceplate.

  1. Touch up nail holes.

Back to top


Anchor
Related-Training-Materials
Related-Training-Materials
Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix

Back to top


Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery
Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.

Back to top


Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

Bottom Cap:

  1. The bottom cap is in the correct location with appropriate overhangs on the sides and front.

  2. There is no gap between the bottom shelf and bottom cap.

  3. Screws have been placed through the bottom shelf into the bottom cap at each partition.

  4. Fast caps or wax crayon have been used to conceal each screw.

Top Cap:

  1. The top cap is in the correct location with appropriate overhangs on the sides and front.

  2. There is no gap between the top shelf and top cap.

  3. Nails have been placed in each corner and every 12” in the front and back of the top cap.

  4. Nail holes have been touched up.

Toe Kick/Faceplate:

  1. Toe Kick/Faceplate is correctly placed, flush or inset, according to the elevation.

  2. Toe Kick/Faceplate is attached every 6-8” along the fixed shelf.

  3. Toe Kick/Faceplate is attached with at least 1 nail in the side of the partition.

Back to top


Anchor
Tips
Tips
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Panel
panelIconId1f5e3
panelIcon:speaking_head:
panelIconText🗣️
bgColor#DEEBFF

Click here to submit your own tip from the field.

Back to top


Anchor
Terms
Terms
Terms & Definitions

BOM

Bill of Materials; Parts List

Elevation

The CAD Design Plan created by the Design Consultant with the client.

Dry Fit

Holding material or accessory in its intended location to test size accuracy.

Back to top


Anchor
BOM
BOM
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

BC

Bottom Cap

FP

Faceplate

FSCTC

Fascia Top Cap 

KP

Kickplate

TK

Toe Kick

TC

Top Cap

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.