Table of Contents
03. Skeleton Fundamentals
Status | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
This page explains the process for installing a floor-based system. The steps below outline the order of preparing and leveling the skeleton, and supporting the system on the floor.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Next Steps
Certification
Tips from the Field
Terms & Definitions
Anchor | ||||
---|---|---|---|---|
|
Installer Level Required: Journeyman Installer
Products Required: TFL Material, Accessories, Special Order
Anchor | ||||
---|---|---|---|---|
|
Drill Driver/Impact Drill
4' Level
Step Ladder
Hammer
Par Feet (Option 1)
Shims (Option 2)
Hardware Required
3/4” x #8 Screws
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance. |
Remove baseboards (if applicable) for all areas located behind a system.
Expand | ||
---|---|---|
| ||
|
If baseboards are not being removed, notch partitions based on baseboard size and elevation measurements (if applicable).
Ensure you have checked for the high point in the space.
Hang system rail according to floor-based process steps.
Prepare and hang partitions. If using par feet for support, attach par feet during this step.
Install top, middle and bottom fixed shelves.
Level system from the high spot in the room. Slide your level across the top of the system and adjust the partition suspension brackets accordingly.
Expand | ||
---|---|---|
| ||
|
Plumb the system from left to right using a 2 or 4-foot level to ensure it is square.
Expand | ||
---|---|---|
| ||
|
If partitions are longer than 6 feet, check for levelness in two spots: high and low.
Secure corner brackets to the wall.
Expand | ||
---|---|---|
| ||
|
Close the corner bracket caps.
Expand | ||
---|---|---|
| ||
|
If using shims for support, place them under the front and back of each partition.
Expand | ||
---|---|---|
| ||
|
Anchor | ||||
---|---|---|---|---|
|
Skeleton Fundamentals
PPE Matrix
Anchor | ||||
---|---|---|---|---|
|
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps:
|
Anchor | ||||
---|---|---|---|---|
|
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Click here to submit your own tip from the field.
Anchor | ||||
---|---|---|---|---|
|
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
Level | The wall or system is horizontally straight. |
Plumb | The wall or system is vertically straight. |