This page outlines the process for installing various types of grommets not requiring power. Prior to completing any of these processes, ensure you have completed installing the system skeleton and any other parts involving the grommet.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Round Grommets
Rectangular Grommets
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Anchor
Skill-Requirements
Skill-Requirements
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed

Installer Level Required: Apprentice Installer

Products Required: TFL Material, Accessories, Special Order

Back to top


Anchor
Tools-&-Hardware
Tools-&-Hardware
Tools Required

image-20241120-152046.png

Drill Driver/Impact Drill

image-20241120-152100.png

Tape Measure

image-20241120-152123.png

Pencil

image-20241120-152154.png

Vacuum

image-20241120-152244.png

1.75” Hole Saw
Square Grommet

image-20241120-152236.png

2.5” Hole Saw
Round Grommet, Dual Grommet

image-20241120-152258.png

3 1/8” Hole Saw
Round Grommet w/ Brush

image-20241121-143210.png

Jigsaw

image-20241121-143242.png

Down-Cut Blade

image-20241121-134758.png

Utility Scissors

Hardware Required

image-20241120-153428.png

Square Grommet
Byrne: BE04402SQ

image-20241120-153610.png

Round Wire Grommet
TAG: 300.4388

image-20241120-153443.png

Round Wire Grommet w/ Brush
Hafele: 631.26

image-20241120-154327.png

Dual Grommet
Hafele: 631.24

image-20241120-153627.png

Single Wall Outlet Grommet
TAG: 300.4332

image-20241120-153632.png

Double Wall Outlet Grommet
TAG: 300.4364

image-20241120-153652.png

1/4” Grommet
TAG: 300.5414

Back to top


Anchor
Installation-Steps
Installation-Steps
Installation Steps

Panel
panelIconId1f9ba
panelIcon:safety_vest:
panelIconText🦺
bgColor#FFFAE6

Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

Round Grommets

Anchor
round
round

Square Grommet, Round Wire Grommet, Round Wire Grommet w/ Brush

  1. Determine the location of the grommet as indicated by the elevation.

Expand
titleClick for more information
  • This will be indicated by a text note.

  • The default location unless otherwise noted: Maintain a minimum 1” distance from the edge of the hole to the back/side of the material.

    • Dual Grommets: Must be placed a minimum 1” distance from the edge of the hole to any adjacent parts. Ensure they do not conflict with any partition hardware.

    • This will allow for strength in the countertop; the closer you get to the edge, the weaker the edge becomes.

  • If the location is unclear, reach out to the design consultant for clarity.

  1. Confirm measurement of grommet.

Expand
titleClick for more information
  • Use the table below to determine the measurements for the grommet you are installing.

Square Grommet

Round Wire Grommet

Round Wire Grommet w/ Brush

Dual Grommet

Diameter

1.75”

2.5”

3 1/8

2.5”

Center Point

7/8”

1.25”

1 9/16

1.25”

Hole Saw Size

1.75”

2.5”

3 1/8

2.5”

  1. Measure the location of the grommet.

Expand
titleClick for more information
  • The default location unless otherwise noted: Maintain a minimum 1” distance from the edge of the hole to the back/side of the material.

    • Dual Grommets: Must be placed a minimum 1” distance from the edge of the hole to any adjacent parts. Ensure they do not conflict with any partition hardware.

  • Measure 1” (unless otherwise indicated from DC) + grommet center point from the back of the material. Make a mark.

    • For example, if installing a square grommet, measure 1” + 7/8” from the back.

  • Measure 1” (unless otherwise indicated from DC) + grommet center point from the side of the material Make a mark.

    • For example, if installing a square grommet, measure 1” + 7/8” from the side.

  • Extend markings to intersect

  • Double check measurements (measure twice, drill once) and confirm there are no obstructions (modesty panels, hardware, wrap panels, etc.) below the cut.

  1. Cut the hole for the accessory.

Expand
titleClick for more information
  • Place the center of the hole saw against the intersection of marks.

  • Complete the cut.

    • Use both hands to stead the tool.

    • Do not apply too much pressure as the tool builds speed; allow the saw to cut through the material naturally.

    • If both sides of the material will be visible, begin the cut from one side, and complete the cut from the other side using the drilled hole as a position guide. This will ensure a cleaner cut on both sides.

    • If only one side of the cut is visible, cut from one side.

  1. Dual Grommet Only: Cut the grommet to size according to the material thickness

Expand
  • Insert the male side of the grommet through the cut hole.

  • Make a mark on the grommet from the other side of the partition (to mark the depth required for the grommet).

  • Cut the male side of the grommet 1/8” short of the mark.

  1. Dry fit the grommet.

  2. Vacuum all shavings on the material, under the material, and around the system.

  3. Install the grommet.

Expand
titleClick for more information
  • Place the grommet bottom side into the hole.

  • Square Grommets: Secure the grommet by screwing the nut onto the grommet from underneath.

  • Dual Grommets: Place male end into the female end and snap together.

  1. Remove cut material from the hole saw.

Expand
titleClick for more information
  • Use a flat screwdriver and place it through various holes in the hole saw to pry the material off of the center drillbit.

  1. Demonstrate to the customer how to snap out the center cap.

Back to top

Rectangular Grommets

Anchor
rectangle
rectangle

Single Wall Outlet Grommet, Double Wall Outlet Grommet, 1/4” Grommet

  1. Determine the location of the grommet based on outlet location

Expand
titleClick for more information
  • Measure from a vertical reference point (shelf, countertop, floor) to the center of the outlet

  • Measure from a horizontal reference point (wall, partition) to the center of the outlet

  1. Transfer measurements to the material being cut. Extend the marks to create a large intersection

  2. Place the grommet at the intersection to confirm cut placement. Trace the bottom edge of the grommet.

  3. Confirm centerpoint measurements to outlet and grommet placement (measure twice, cut once)

  4. Cut the hole for the grommet.

Expand
titleClick for more information
  • Drill a hole inside each corner of the marked rectangle using a ¼” bit

  • With a jigsaw, cut along each line to connect each dot using a down cut blade

  • Square out each corner

  • Using rag and water or cleaner, wipe off any remaining pencil marks

  1. Dry fit the grommet.

  2. Install the grommet by placing it firmly into the hole.

  3. Vacuum all shavings on the material, under the material, and around the system.

Back to top


Anchor
Related-Training-Materials
Related-Training-Materials
Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form

Back to top


Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery
Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.

Back to top


Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

  1. The correct size hole was cut for the grommet.

  2. The grommet is in the correct location according to the minimum standard and any notes on the elevation.

  3. The grommet fits securely in the hole.

  4. The area has been vacuumed of all shavings and material.

  5. Round Grommets: A demonstration was provided to the customer.

Back to top


Anchor
Tips
Tips
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Panel
panelIconId1f5e3
panelIcon:speaking_head:
panelIconText🗣️
bgColor#DEEBFF
  • Dual Grommets: If the grommet feels loose after installing, secure both ends to each other using 2P-10 or similar adhesive.

Click here to submit your own tip from the field.

Back to top


Anchor
Terms
Terms
Terms & Definitions

BOM

Bill of Materials; parts list

Back to top


Anchor
BOM
BOM
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

Text Note

A text note will be included on the elevation to indicate any grommet’s location

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Back to top