The purpose of this page is to outline the process for installing fixed shelves and vertical dividers using The Leaman™ Connector. Prior to beginning this process, ensure the system rail is hung, and partitions are hung, level, plumb, and secured. This process does not apply to Connecting Shelves using The Leaman™.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Cover Cap Match Chart


Anchor
Skill-Requirements
Skill-Requirements
Types of Installation: Off-the-Floor, Floor-Based

Installer Level Required: Apprentice Installer

Products Required: TFL Material, Special Order

Back to top


Anchor
Tools-&-Hardware
Tools-&-Hardware
Tools Required

image-20240904-200703.png

Soft Faced Mallet

image-20240904-200722.png

Drill Driver/Impact Drill

image-20240904-200744.png

Phillips Bit

image-20240904-200805.png

4mm Hex Key

Pasted-20241029-160757_preview_rev_1-20241029-200833.png

The Leaman™ Dowel Drilling Jig

image-20240909-170935.png

The Leaman™ Dowel Insertion Jig

Hardware Required

image-20240904-200145.png

The Leaman™ Dowel

image-20240904-201229.png

The Leaman™ Insert

image-20240904-201312.png

8mm Euro Screw
19mm back-to-back applications

image-20240904-201312.png

11mm Euro Screw
Thicker material applications

Back to top


Anchor
Installation-Steps
Installation-Steps
Installation Steps

Panel
panelIconId1f9ba
panelIcon:safety_vest:
panelIconText🦺
bgColor#FFFAE6

Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. If Applicable: Assemble the Leaman Insert into the partitions.

Expand
titleClick for visuals and more information
  • Use a soft faced mallet, pound the insert into the partition until it is flush, or slightly sub-flush, with the face of the partition.

  • For 19mm back-to-back applications: Secure each insert using an 8mm Euro Screw on a low torque setting until the screw is fully seated in the countersink.

    • For all other applications, an 11mm Euro Screw can be used.

The Leaman Insert Step 1.gif
  1. If Applicable: Insert the Leaman Dowel into the supported part.

Expand
titleClick for visuals and more information
  • Identify the access hole side of the supported part

  • Ensure the flat side of the dowel faces the access hole side

  • Insert the dowels into the edge hole as far as possible, and use the Leaman™ Dowel Insertion Jig into the supported part until the insertion tool bottoms out on the shelf

  • Flip the supported part and repeat the process on the other side

The Leaman Dowel Step 2.gif

Partitions may be sent with the inserts already in place, and may only need the euro screw to be secured to each insert. Shelves may be sent to the field with the dowels already in place.

  1. Install The Leaman shelf by connecting the dowels into the partition inserts.

Expand
titleClick for visuals and more information
  • Tilt the Supported Part into the component so that it does not catch or scratch the material.

  • Starting with one side, align the Dowel Plungers with the front of the keyhole on the Leaman Insert 

  • Push the shelf towards the back of the component until dowels on both sides slide to the back of the keyed slot of the insert.

  • Check that all 4 dowels are properly seated in the back of the keyed slot by shaking each corner of the shelf. The part should not be able to move more than 1/8”

  • Before locking the part, adjust it to be flush with the partitions.

    • There is some front-to-back tolerance that you can flush the part with the partition as needed.

image-20240904-195118.pngShelf Insertion Step 3.gif

The location of the access hole will be indicated on the elevation using the following symbols:

v = Bottom of shelf

^ = Top of shelf

< = Left of Vertical Divider

> = Right of Vertical Divider

  1. Lock the cam in the dowel using a 4mm hex key and rotate it 1/4 turn (90 degrees).

Expand
titleClick for visuals
  • If the elevation states to include cover caps, place cover caps in access holes of indicated sightline shelves.

image-20240904-195214.pngLocking Cam Step 4.gif

IMPORTANT: Attempting to rotate the cam more than 1/4 turn will strip out the hex of the dowel.

  1. If Applicable: Install standard backing or press-in backing panels.

  2. Complete the remainder of the installation.

Removing a Leaman Shelf

  1. Unlock all Leaman™ Dowels by putting a 4mm Hex Key in the access hole and rotating ¼ turn counterclockwise 

  2. Pull the Part straight out until the Dowel plungers are no longer seated in the Inserts 

  3. Tilt the Part and pull out the rest of the way 

Manually Drilling for a Leaman Dowel

  1. The Leaman Dowel Drilling Jig can be used to assist with manually drilling a shelf for the Dowel. 

  2. Ensure the jig is set to the correct board thickness for the application 

Expand
titleClick for visuals
image-20240904-195604.png
  1. Using a 12mm drill bit, drill the edge hole at least 45mm deep. 

Expand
titleClick for visuals
image-20240904-195619.png
  1. Next, use the jig to drill the ¼” access hole 

Expand
titleClick for visuals
image-20240904-195637.png

Back to top


Anchor
Related-Training-Materials
Related-Training-Materials
Related Training Materials

Skeleton Fundamentals
Complete the Installation
The Leaman™ Connecting Shelf
Installation Videos
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form

Back to top


Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery
Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.

Back to top


Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

  1. The access holes are facing the correct location according to the indicators on the elevation.

  2. The cams are locked and the shelf is securely in place.

Back to top


Anchor
Tips
Tips
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Panel
panelIconId1f5e3
panelIcon:speaking_head:
panelIconText🗣️
bgColor#DEEBFF

Click here to submit your own tip from the field.

Back to top


Anchor
Terms
Terms
Terms & Definitions

BOM

Bill of Materials; parts list

Elevation

The CAD Design Plan created by the Design Consultant with the client

Supported Part

TFL material utilizing The Leaman Connector

The Leaman

This hardware is a functional hardware strategy that offers solutions that are either "invisible" to the customer or have a refined design aesthetic.

The Leaman is named in honor of Edward Leaman, our former Chief Brand & Design Officer. A leader and visionary, Edward helped evolve the California Closets brand by consciously “connecting” the work we do to who we are. He was humble, steadfast, and critical to defining our difference, which is exactly how The Leaman will distinguish the concealed visual appeal and experience of our Suite Hardware. 

Back to top


Anchor
BOM
BOM
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Back to top


Anchor
Cover
Cover
Cover Cap Finish Match
Use the chart below to determine the correct cover cap to use for the finish you are installing.

Board Finish

Access Hole Cover Cap Finish

White

White

Dove

White

Morning Light

Light Gray

Cinder

Black

Deep Pond

Black

Misty Orchard

Light Gray

Grigio

Light Gray

Ash 2.0

Black

Natural

Ivory

Quiet Grove

Brown Beige

Siena

Brown

Cool Avenue

Black

Washed White 2.0

White

Shadow Black 2.0

Black

Linen 2.0

Light Gray

Bianco 2.0

White

Back to top