Table of Contents
Section Header
Status | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
This page outlines the process for installing various types of cable management accessories. Prior to completing any of these processes, ensure you have completed installing the system skeleton and any other parts involving the accessory.
Page Contents
Skill Requirements
Tools & Hardware
Installation Step
Clamps
J Wire
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Anchor | ||||
---|---|---|---|---|
|
Installer Level Required: Jr. Apprentice Installer
Products Required: Accessories, Special Order
Anchor | ||||
---|---|---|---|---|
|
Drill Driver/Impact Drill
Tape Measure
Utility Scissors
Hardware Required
V-Shaped Cable Holder
Richelieu: 20312944290
Cable Clamp
Richelieu: 1691490
Single J Wire
Hafele: 829.15
3/4” Screws
3/4” Panhead Screws
1/4” Washer
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance. |
V-Shaped Cable Holder & Cable Clamp
Anchor | ||||
---|---|---|---|---|
|
Verify location as indicated by the elevation and orient side-to-side.
If multiple holders are being used, keep them in line with each other and space evenly.
There should be no more than 24” between holders to reduce cable sag.
Mount using (4) ¾” screws.
J Wire Management
Anchor | ||||
---|---|---|---|---|
|
Verify location as indicated by the elevation.
Cut piece to size using utility scissors
J Wires are pre-cut in common sizes: 18", 24", 36", 48", 60", 72", 96"
Ensure there is space (2.5”) allotted on either side for cords to run without being pinched.
Mount to the underside of the countertop or side of a partition using included adhesive.
For additional security, mount using 3/4” panhead screws or a 3/4” screw with 1/4” washer every 12” - 18”
Demonstrate to the customer how to tuck cords into the channel.
Expand | ||
---|---|---|
| ||
Anchor | ||||
---|---|---|---|---|
|
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
Anchor | ||||
---|---|---|---|---|
|
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps: |
Anchor | ||||
---|---|---|---|---|
|
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Click here to submit your own tip from the field.
Anchor | ||||
---|---|---|---|---|
|
BOM | Bill of Materials; parts list |
Anchor | ||||
---|---|---|---|---|
|
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
Text Note | A text note will be included on the elevation to indicate any grommet’s location |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.