Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
Journeyman to Senior Installer

Status
colourGreen
titlelive
Anchor
Page
Page

...

A printable version is linked at the bottom of this page under Related Training Materials

Page Contents:

Job Information
Pre-Arrival Checklist
Photo Checklist
Rail/Partition
Cabinet Assembly
Top Shelf
Bottom Stretcher
Headboard
Toe Kick
Bed Frame Assembly
Bed Frame Attachment
Leg Adjustment
Top Stretcher
Lock
Mattress Installation
Finishing Touches
Related Training Materials

...

  • Test pull down/push up mechanism of system 

  • Re-install pistons (if they were removed). 

  • Re-attach the Mechanism Cover using all mounting screws. Ensure screws are tight and not stripped (SMM: Page 32, Step 8 | DSM: Page 29, Step 2). 

  • Re-install Top Steel Stretcher (if removed). 

  • Double check safety labels are in their correct places.

  • Ensure all safety check photos have been taken.

  • Provide the mattress set up document to the customer and advise they wait 48 hours to allow the mattress to inflate before use.

  • Checklist uploaded to Dashboard

...

Anchor
Related
Related
Related Training Materials

Soft Motion Wall Bed Installation Manual
Soft Motion Wall Bed + Desk Installation Manual
Download Checklist for Printing
Product Feedback Form

Back to top

...