Table of Contents
01. Starting Your Day
Status | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
This page will explain the best practices for loading a van using both the cart and hand method. It will also explain loading cabinets, drawers, specialty items, hardware, and accessories. By following these steps, all materials are expected to be organized and secured in the van, ready to be transported safely.
...
Expand | ||||
---|---|---|---|---|
| ||||
Drawer Box Loading Definitions
|
If the installation is a multi-day install, bring drawer boxes separately on Day 2+, as needed.
...
Expand | ||
---|---|---|
| ||
|
Perform the introductory call to the customer to advise you are on the way and your estimated time of arrival.
Prepare to leave for the installation. If multiple vans are going to the jobsite, coordinate any stops along the way, parking upon arrival, etc.
...
Arrival Expectations
Van Stocking
CC360: A Day in the Life of a Jr. Apprentice
PPE Matrix
Product Feedback Form
...
Anchor | ||||
---|---|---|---|---|
|
...
Anchor | ||||
---|---|---|---|---|
|
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
...