The purpose of this page is to outline the process of installing the floating shelf provided by Schenk. The steps in this process have been vigorously tested and are mandatory to be followed for all floating shelf installations.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton, Martha Stewart
Installer Level Required: Jr. Apprentice Installer, Apprentice Installer, Journeyman Installer, Senior Installer, Master Installer
Products Required: TFL Material, Accessories, Special Order
Tools Required
4' Level
Tape Measure
Stud Finder
Pencil
Drill Driver/Impact Drill
Phillips Screw Driver
(Drywall Applications Only)
3/16” Allen Wrench
(Drywall Applications Only)
1/2” Drill Bit
(Drywall Applications Only)
1/4” Drill Bit
(Drywall Applications Only)
T30 Drive Bit
5/32” Drill Bit
Hardware Required
Toggle Bolts
Installation Steps
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Measure for 1/4” below the shelf height and mark a level line for the bracket height.
Follow bracket rules when determining attachment locations.
Locate the template placement.
If the mounting location includes drywall or a steel stud, proceed to step 5
Wood Stud Securement: Using a T30 Drive Bit, drive a structural screw into the lower indicator on the mounting template.
Drywall/Steel Stud Securement: Drill for a wall toggle using a 1/2” bit.
Drywall/Steel Stud Securement: Install the wall toggle.
Drywall/Steel Stud Securement: Install the Base Plate
Drywall/Steel Stud Securement: Slide the toggle bolt through the base plate and drywall plate, and thread into the toggle
Lower each Bracket Arm into each Base Plate and lock into place.
Level the brackets.
Install the shelf
Due to the interior depth allowance for the bracket arms, shelves cannot be scribed to the wall
Related Training Materials
Skeleton Fundamentals
360Share: Floating Shelf Installation Video
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Final Steps & Delivery
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Certification Steps:
The bracket guidelines were followed.
The brackets are level with each other.
The shelf is attached to the brackets using the included self-tapping screws.
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Click here to submit your own tip from the field.
Terms & Definitions
BOM | Bill of Materials; parts list |
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
FS | Floating Shelf |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.
Add Comment