This page explains the steps to take for installing a standard TFL fixed shelf. Prior to beginning this process, ensure the rail has been hung and partitions are prepped and hanging on the rail for all spaces.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Next Steps
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Types of Installation: Off-the-Floor, Floor-Based, Wall Bed

Installer Level Required: Jr. Apprentice Installer

Products Required: TFL Material

Back to top


Tools Required

Pozi #2 Screwdriver

Angle Ratchet Pozi #2

Hardware Required

Fixed Shelf Rafix Pins

Rafix Double-Ended Dowel (Optional)

Back to top


Installation Steps

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Ensure the Rafix pins are in the partitions in the appropriate locations. This should be done while prepping the partition.

 Click for visuals

If shelves are being installed on either side of a shared partition, double-ended dowels may be used and inserted from left to right.

  1. Locate the shelves in the staging area.

  2. Double check the measurements on the BOM and the label to ensure the correct sizes are being placed in the correct location(s).

 Click for visuals
  1. Inspect the shelf for chips, damage, and missing or damaged Cams.

 Click for more information
  • Inspect the shelf prior to removing the sticker in case the shelf needs to be replaced due to damage.

  1. Check the Cams and ensure they are positioned in the shelf correctly and in the open position.

 Click for visuals and more information
  • Ensure that each cam is aligned correctly and flush with the shelf surface.

  • Ensure that each inner cam is in the open position.

  • If either pieces are not in the correct position, reposition them using a Pozi #2 screwdriver.

  • If the Cams are not in the open position, the Cam may be damaged when placing the shelf and become unusable.

IMG_6259-ezgif.com-video-to-gif-converter.gif
  1. Set the shelf on the Rafix screws and ensure the Cams are sitting on each screw.

Keep fixed shelves right side up.  As these shelves are load bearing, it is important they are installed with the Cam side facing the bottom of the system.

  1. Tighten each Cam clockwise until they stop turning using a Pozi #2 bit screwdriver.

 Click for visuals and more information
  • Do not overtighten or use a drill to tighten as this will run the risk of damaging the cam.

  • Ensure the screwdriver is completely inserted in the Cam.

When installing bottom fixed shelves, place the shelf on the Rafix pins, and lift the front of the shelf up to tighten the back Cams with a small angled ratchet.  Place the front of the shelf down and use the small ratchet to lock in the front Cams.

  1. Check the shelf for tightness. Gently push upwards to make sure it is locked in place.

  2. Repeat for all remaining shelves, as indicated by an X on the elevation.

 Click for visuals

Back to top


Related Training Materials

Skeleton Fundamentals
PPE Matrix

Back to top


Next Steps: Level, Plumb, Secure the System

Back to top


Certification Steps:

  1. Rafix pins are in the correct System 32 holes according to the system elevation.

  2. Shelf has been inspected for chips or damage, and repaired if needed (See Touch Ups)

  3. Cams are confirmed to be open.

  4. Shelf has been installed and locked in place.

Back to top


Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Click here to submit your own tip from the field.

Back to top


Terms & Definitions

BOM

Bill of Materials; Parts List

Elevation

The CAD Design Plan created by the Design Consultant with the client.

Back to top


BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

SF

Shelf Fixed

TS

Top Shelf

VB

VB; Verbindungen

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Back to top

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.