System Touch Up
Table of Contents
05. Final Installation Steps & Delivery
This page explains the process to identify and touch up concern areas on an installed system. All system components should be inspected throughout the installation of the system. With any touch ups completed, ensure the final result is not visible to the naked eye, and blends properly with the material.
Page Contents
Skill Requirements
Tools & Hardware
Process Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton, Martha Stewart
Installer Level Required: Jr. Apprentice Installer
Products Required: TFL Material, Accessories
Ceramic Scraper
Wax Crayon
System Cleaner
Rags
Hardware Required
Fast Caps
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Identify areas of touch up.
Touch up dings and scratches.
Touch up trim work.
Cover screws with fast caps.
Skeleton Fundamentals
Complete the Installation
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
If all touch ups have been completed, complete the clean up process.
Complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Certification Steps:
All identified areas have been waxed or touched up using a marker.
All excess wax or marker has been cleaned up and removed.
All touched up areas blend in with the system and are not visible to the naked eye.
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.