This page explains the steps to take for installing vertical uprights. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed
Installer Level Required: Apprentice Installer
Products Required: TFL Material
Tools Required
Tape Measure
Angle Ratchet Pozi #2
Pozi #2 Screwdriver
Wood Glue
Hardware Required
Dowels
(Hafele 267.83.230)
Installation Steps
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Locate and inspect all parts.
Place dowels in both ends of the vertical upright.
If Applicable: Trim the length of the dowel(s) to ensure a tight fit between the pieces.
Secure the bottom fixed shelf between the partitions, ensuring the pre-drilled holes are facing upwards.
Place the vertical upright dowels into the pre-drilled holes on the bottom fixed shelf.
Install the top fixed shelf.
Related Training Materials
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Final Steps & Delivery
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Certification Steps:
Top and bottom shelves are locked in.
Dowels have been used to connect the vertical pieces to the horizontal fixed shelves.
There are no gaps between the vertical pieces and the horizontal fixed shelves.