Status | ||||
---|---|---|---|---|
|
Anchor | ||||
---|---|---|---|---|
|
This page explains the steps to take for installing accessory racks. This includes belt, tie, scarf, and garment racks. Prior to beginning the installation, ensure you have completed all steps of installing the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Anchor | ||||
---|---|---|---|---|
|
Installer Level Required: Jr. Apprentice Installer
Products Required: Accessories, Special Order
Anchor | ||||
---|---|---|---|---|
|
Drill Driver/Impact Drill
3/16” Spade Bit
Hardware Required
Scarf Rack
Belt Rack
Tie Rack
Valet Rod
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance. |
Locate where the accessory is to be installed.
Expand | ||
---|---|---|
| ||
|
If Applicable: Mark and drill holes.
Expand | ||
---|---|---|
| ||
|
Organize the accessory.
Expand | ||
---|---|---|
| ||
|
Mount the track.
Expand | ||
---|---|---|
| ||
|
Attach the accessory and cap the ends.
Expand | ||
---|---|---|
| ||
|
Anchor | ||||
---|---|---|---|---|
|
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Anchor | ||||
---|---|---|---|---|
|
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps:
|
Anchor | ||||
---|---|---|---|---|
|
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Click here to submit your own tip from the field.
Anchor | ||||
---|---|---|---|---|
|
BOM | Bill of Materials; Parts List |
Component | Individual section of a system formed by a partition on either side. |
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
Anchor | ||||
---|---|---|---|---|
|
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
BR | Belt Rack |
GR | Garment Rod |
ST | Scarf Rack |
TR | Tie Rack |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.