05. Final Installation Steps & Delivery

Status
colourGreen
titlelive
Anchor
Top
Top

This page will explain the process and areas to clean on the installed system and jobsite. This is one of the most important steps to take during an installation as this will be the final product delivered to the customer. Ensure you are leaving the home and space better than the way you found it.

Page Contents

Skill Requirements
Tools & Hardware
Process Steps
Related Training Materials
Final Steps & Delivery
Certification


Anchor
Skill-Requirements
Skill-Requirements
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton, Martha Stewart

Installer Level Required: Jr. Apprentice Installer

Products Required: TFL Material, Accessories, Special Order

Back to top


Anchor
Tools-&-Hardware
Tools-&-Hardware
Tools Required

System Cleaner

Rags

Vacuum

Ceramic Scraper Tool

Back to top


Anchor
Installation-Steps
Installation-Steps
Process Steps

Panel
panelIconId1f9ba
panelIcon:safety_vest:
panelIconText🦺
bgColor#FFFAE6

Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Clean tools and debris.

Expand
titleClick for more information
  • Remove tools, hardware, accessories and put them away.

  • Place garbage and debris in the van to dispose of upon return to the shop/warehouse.

  1. Ensure stickers are removed.

Expand
titleClick for more information
  • Inspect the system to ensure all stickers have been removed.

  • If any are remaining, peel off by gently pulling on them.  If they are tough to get off, spray cleaner and wait 10-20 seconds.  Use a scraper to get any remaining residue off.

  1. Wipe the system down.

Expand
titleClick for more information
  • Using proper PPE, use the rag and cleaner and thoroughly wipe down the system.

  • Clean any exposed surfaces including the bottoms of shelves, the top of the system, and “hidden” areas.

  1. Use wax filler on blemishes.

Expand
titleClick for more information
  • Refer to the touch up page for the process.

  1. Vacuum drawer boxes.

Expand
titleClick for more information
  • Using your vacuum, clean out all drawers in the system(s).

  • Vacuum out the box and, using a rag, wipe the inside of the box to capture any remaining dirt/dust.

  • Wipe down the outside of the drawer with a rag and cleaner.

  1. Remove any marker.

Expand
titleClick for more information
  • If there is any marker on the system, use a stronger cleaner, such as lacquer thinner or goof-off.

  • If the marker does not come off, the part may need to be replaced.

  • Always clean marker as soon as possible.

  1. Vacuum any dust or dirt on the floor, hallway, or area visited during the installation.

Back to top


Anchor
Related-Training-Materials
Related-Training-Materials
Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Delivery to the Customer
PPE Matrix

Back to top


Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery
Final Steps & Delivery

  1. Complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.

Back to top


Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

  1. ALL Labels have been removed.

  2. All system components have been wiped down using system cleaner.

  3. The system has been vacuumed (drawer cavity, drawer boxes, floor around the system)

  4. Blankets, tarps, and runners are removed, and floors are vacuumed.

Back to top