Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
Section Header

Status
colourYellow
titleIN REVIEW
Anchor
Top
Top

This page outlines the process for installing various types of cable management accessories. Prior to completing any of these processes, ensure you have completed installing the system skeleton and any other parts involving the accessory.

Page Contents

Skill Requirements
Tools & Hardware
Installation Step
Clamps
J Wire
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Anchor
Skill-Requirements
Skill-Requirements
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton, Martha Stewart

Installer Level Required: Jr. Apprentice Installer

Products Required: Accessories, Special Order

Back to top


Anchor
Tools-&-Hardware
Tools-&-Hardware
Tools Required

image-20241121-134508.png

Drill Driver/Impact Drill

image-20241121-134527.png

Tape Measure

image-20241121-134758.png

Utility Scissors

Hardware Required

image-20241121-134045.png

V-Shaped Cable Holder
Richelieu: 20312944290

image-20241121-134057.png

Cable Clamp
Richelieu: 1691490

image-20241121-134112.png

Single J Wire
Hafele: 829.15

image-20241121-134349.png

3/4” Screws

image-20241121-134414.png

3/4” Panhead Screws

image-20241121-134436.png

1/4” Washer

Back to top


Anchor
Installation-Steps
Installation-Steps
Installation Steps

Panel
panelIconId1f9ba
panelIcon:safety_vest:
panelIconText🦺
bgColor#FFFAE6

Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

V-Shaped Cable Holder & Cable Clamp

Anchor
clamp
clamp

  1. Verify location as indicated by the elevation and orient side-to-side.

    1. If multiple holders are being used, keep them in line with each other and space evenly.

    2. There should be no more than 24” between holders to reduce cable sag.

  2. Mount using (4) ¾” screws.

J Wire Management

Anchor
wire
wire

  1. Verify location as indicated by the elevation.

  2. Cut piece to size using utility scissors

    1. Ensure there is space (2.5”) allotted on either side for cords to run without being pinched.

  3. Mount to the underside of the countertop or side of a partition using included adhesive.

    1. For additional security, mount using 3/4” panhead screws or a 3/4” screw with 1/4” washer every 12” - 18”

  4. Demonstrate to the customer how to tuck cords into the channel.

Back to top


Anchor
Related-Training-Materials
Related-Training-Materials
Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form

Back to top


Anchor
Final-Steps-&-Delivery
Final-Steps-&-Delivery
Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.

Back to top


Anchor
Certification-Steps
Certification-Steps

Panel
panelIconId270d
panelIcon:writing_hand:
panelIconText✍️
bgColor#E3FCEF

Certification Steps:

Back to top


Anchor
Tips
Tips
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Panel
panelIconId1f5e3
panelIcon:speaking_head:
panelIconText🗣️
bgColor#DEEBFF

Click here to submit your own tip from the field.

Back to top


Anchor
Terms
Terms
Terms & Definitions

BOM

Bill of Materials; parts list

Back to top


Anchor
BOM
BOM
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

Text Note

A text note will be included on the elevation to indicate any grommet’s location

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Back to top