This page outlines the process for installing various types of cable management accessories. Prior to completing any of these processes, ensure you have completed installing the system skeleton and any other parts involving the accessory.

Page Contents

Skill Requirements
Tools & Hardware
Installation Step
Clamps
J Wire
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed, Paxton, Martha Stewart

Installer Level Required: Jr. Apprentice Installer

Products Required: Accessories, Special Order

Back to top


Tools Required

image-20241121-134508.png

Drill Driver/Impact Drill

image-20241121-134527.png

Tape Measure

image-20241121-134758.png

Utility Scissors

Hardware Required

image-20241121-134045.png

V-Shaped Cable Holder
Richelieu: 20312944290

image-20241121-134057.png

Cable Clamp
Richelieu: 1691490

image-20241121-134112.png

Single J Wire
Hafele: 829.15

image-20241121-134349.png

3/4” Screws

image-20241121-134414.png

3/4” Panhead Screws

image-20241121-134436.png

1/4” Washer

Back to top


Installation Steps

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

V-Shaped Cable Holder & Cable Clamp

  1. Verify location as indicated by the elevation and orient side-to-side.

    1. If multiple holders are being used, keep them in line with each other and space evenly.

    2. There should be no more than 24” between holders to reduce cable sag.

  2. Mount using (4) ¾” screws.

J Wire Management

  1. Verify location as indicated by the elevation.

  2. Cut piece to size using utility scissors

    1. Ensure there is space (5”) allotted on either side for cords to run without being pinched.

  3. Mount to the underside of the countertop or side of a partition using included adhesive.

    1. For additional security, mount using 3/4” panhead screws or a 3/4” screw with 1/4” washer every 12” - 18”

  4. Demonstrate to the customer how to tuck cords into the channel.

Back to top


Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form

Back to top


Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.

Back to top


Certification Steps:

Back to top


Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Click here to submit your own tip from the field.

Back to top


Terms & Definitions

BOM

Bill of Materials; parts list

Back to top


BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

Text Note

A text note will be included on the elevation to indicate any grommet’s location