Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Version History

Version 1 Next »

UNDER CONTSTRUCTION

This page explains the steps to take for installing vertical uprights. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification


Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed

Installer Level Required: Apprentice Installer

Products Required: TFL Material

Back to top


Tools Required

Tape Measure

image-20240422-135424.png

Angle Ratchet Pozi #2

image-20240422-135532.png

Pozi #2 Screwdriver

Hardware Required

image-20240422-140141.png

Dowels
(Hafele 267.83.230)

Back to top


Installation Steps

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Locate and inspect all parts.

 Click for more information
  • The bottom shelf should be drilled on the top side and the top shelf should be drilled on the bottom side.

  • The vertical shelf should be drilled on both ends.

  1. Place dowels in both ends of the vertical upright.

  2. Secure the bottom fixed shelf between the partitions, ensuring the pre-drilled holes are facing upwards.

  3. Place the vertical upright dowels into the pre-drilled holes on the bottom fixed shelf.

  4. Install the top fixed shelf.

 Click for more information
  • Once all vertical uprights have been inserted, ensure the pre-drilled holes on the top fixed shelf are facing downward and align the holes with the dowels and the cams with the Rafix pins.

Back to top


Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix

Back to top


Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.

Back to top


Certification Steps:

  1. Top and bottom shelves are locked in.

  2. Dowels have been used to connect the vertical pieces to the horizontal fixed shelves.

  3. There are no gaps between the vertical pieces and the horizontal fixed shelves.

Back to top

  • No labels