The purpose of this page is to provide expectations and best practices for setting up a successful jobsite and installations. Installers are expected to practice these steps on all jobsites.
Page Contents
Process Expectations
Final Steps & Completion
Related Training Materials
Process Expectations
Practice safety at all times
Wear Personal Protective Equipment
Do not carry or move too many or heavy materials by yourself
Do not stand on unauthorized ladder rungs. Review the Installer Safety Training Module in CC360.
Utilize all safety measures and equipment when using power and hand tools
Update your manager by 12:00 local time on the job’s progress. This update must be done whether or not there are issues on the jobsite.
Items to update can include mismeasures, parts to be saved, concerns, anticipated concerns, or there are no issues at all.
In the case the job may be completed early, your manager may reassign you to assist another installer or team.
Communicate with the client during the following opportunities:
Estimated time of arrival at the jobsite
Mid-Day
End of the installation client walkthrough
If Applicable: Any changes to the system during the installation. These should always be discussed with the design consultant/client prior to executing.
For Trade installations: Communicate with the designated onsite contact.
Practice proper protection when staging all materials.
Use drop cloths, shoe booties, runners, tarps, wall protection.
Keep space tidy and organized at all times. This includes your staging space, building space, and area for tools.
Practice professionalism at all times. This includes, but is not limited to:
Language
Do not ever use profanities
Use brand positive and encouraging language
Refrain from discussing politics or current news stories both with your peers and the client.
Your behavior
Keeping entry/exit doors closed
Keeping your space tidy
Representing the brand with pride in your clothing and appearance
Music
Permission must always be requested before any music is played.
Permissible music must be played at a low volume; sound should not carry outside of the space
Only Clean/Radio edits of music are to be played
Work efficiently
Install all part groups at once (hang all rail, hang all partitions, install all fixed shelves, etc.)
Work from left to right around the room, when possible
Work from corners out on each wall
Maximize all trips to and from the van. Avoid traveling empty-handed.
Tidy the area and clean the system as you go; this will limit time required at the end of the installation.
Final Steps & Completion
Manager check-in complete by 12:00
System Delivery Process
Driveway Download Process
Budgeted time hit
Related Training Materials
PPE Matrix
System Delivery Process
Driveway Download Process
Arrival at the Jobsite
Unload, Inspect, Stage Materials
CC360: Installer Safety Training
Add Comment