LIVE
This page explains the steps for installing and adjusting standard drawer boxes. This instruction applies to a side-by-side stack of drawers. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Hettich Drawer Adjustment
Salice Drawer Adjustment
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
BOM Codes
Types of Installation: Off-the-Floor, Floor-Based
Installer Level Required: Jr. Apprentice Installer
Products Required: TFL Material, Accessories, Special Order
Tools Required
Drill Driver/Impact Drill
Hardware Required
Undermount Drawer Runners (Salice or Hettich)
Handle/Knob
9mm Euro Screw
Installation Steps
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Separate and install drawer runners.
Install the drawer box.
If the runners have not clicked into the drawer box, grab the runners from underneath with your fingers and your palms touching the drawer face. Squeeze together until the runners click into place.
Repeat Step 2 for all drawers in the stack and system. When installing a stack of drawers, install them from bottom to top.
Adjust and test.
Adjusting Hettich Drawer Slides
Adjusting Salice Drawer Slides
Install handle or knob. Refer to the decorative hardware guide for hardware specifications.
Related Training Materials
Skeleton Fundamentals
Complete the Installation
Decorative Hardware Guide
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Final Steps & Delivery
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Certification Steps:
Drawer runners have been installed in the correct location according to system elevation.
Drawer has been installed on the runners correctly, and “clicked” in.
Drawer has been adjusted to have all surrounding gaps equal (striving for a 1/8” gap) and aligned with additional drawers (and doors) on the system.
If applicable: Drawer pull/handle installed.
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Click here to submit your own tip from the field.
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
DBB | Drawer Box Base |
DBF | Drawer Box Front |
DBI | Box Insert |
DBK | Drawer Box Back |
DBL | Drawer Box Left |
DBR | Drawer Box Right |
DR | Drawer |
DRB | Custom Drawer Box |
DRF | Drawer Face |
DRS | Drawer Slide |
DSB | SynchroBar |
DSBA | Pair Synchro Adapter |
HL | Handle |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.
Add Comment