The purpose of this page is to outline instructions and considerations when installing all items related to a desk or home office set up.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Types of Installation: Floor-Based, Wall Bed
Installer Level Required: Journeyman Installer
Products Required: TFL Material, Accessories, Special Order
Tools Required
Drill Driver/Impact Drill
Tape Measure
Hardware Required
Acrylic Dividers
Blotter
Deluxe Sit-To-Stand
Richelieu: 50078290
Double Monitor Arm
Richelieu: 500FP2290
File Drawer Frame
Hafele: 422.74
Keyboard Tray
Richelieu: 500848290
Mini Pencil Drawer
Richelieu: 89320090
Single Monitor Arm
Richelieu: 500FP1190
Sit-to-Stand Workstation
Richelieu: 500S2S001R90
Standard Sit-to-Stand
Richelieu: 50072L2S90
Table Legs
Richelieu
3/4” Screws
3/4” Panhead Screws
1/4” Washer
Instructions & Considerations
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Acrylic Dividers
If the accessory is a tray:
Place the tray in its indicated location, as noted on the elevation
Place the horizontal and vertical dividers in their indicated orientation
If the accessory is being placed in a drawer:
If Applicable: Place the bottom pad in place
Place the horizontal and vertical dividers in their indicated orientation
Blotter
Place in position according to the text note on the elevation.
Ensure it is correct side up (texture/design side facing up)
Deluxe Sit-To-Stand
Refer to the instructions provided by Richelieu
Considerations:
The table base should be centered on the countertop
Leave 0.5” to 1” gap from the side edge to the leg frame
Refer to pages 6 and 7 for programming instructions
Programming notes should be included from the designer. If they are not:
Program 1: Lowest Height
Program 2: 30% Height
Program 3: 60% Height
Program 4: Highest Height
Double Monitor Arm
Refer to the instructions provided by Richelieu
Considerations:
If there is a modest panel, this accessory cannot be installed
Demonstrate the adjustability to the customer
Anything around mounting of monitors????
File Drawer
Install the drawer according to standard process.
Demonstrate the file drawer system to the customer and, if applicable, encourage them to place a file folder inside.
Keyboard Tray
Refer to the instructions provided by Richelieu
Considerations:
Spacing
Template
Anything
Mini Pencil Drawer
Refer to the instructions provided by Richelieu
Considerations:
Spacing
Template
Anything
Single Monitor Arm
Refer to the instructions provided by Richelieu
Considerations:
If there is a modest panel, this accessory cannot be installed
Demonstrate the adjustability to the customer
Anything around mounting of monitors????
Sit-To-Stand Workstation
Place on the desk in the location indicated on the elevation.
Place the cable wrap on the desk for the customer to use.
Demonstrate how to use the cable wrap to the customer.
Demonstrate lifting and lowering the workstation.
Standard Sit-To-Stand
Refer to the instructions provided by Richelieu
Considerations:
The table base should be centered on the countertop
Leave 0.5” to 1” gap from the side edge to the leg frame
Table Legs: Round (5 holes)
Table Legs: X Shaped (10 holes)
Table Legs: U Shaped (4 holes)
Place the countertop top side down on the floor.
Place legs in position on bottom of countertop (spacing???)
Mount using 3/4” panhead screws or a 3/4” screw with 1/4” washer
Related Training Materials
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Final Steps & Delivery
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Certification Steps:
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Click here to submit your own tip from the field.
Terms & Definitions
BOM | Bill of Materials; parts list |
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
Text Note | A text note will be included on the elevation to indicate any grommet’s location |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.