Jr. Apprentice to Apprentice Installer

LIVE

This page explains the steps to take for installing standard TFL adjustable shelves. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Types of Installation: Off-the-Floor, Floor-Based

Installer Level Required: Jr. Apprentice Installer

Products Required: TFL Material

Back to top


Hardware Required

Adjustable Shelf Pins

Back to top


Installation Steps

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Ensure the adjustable shelf pins are in the partitions in the correct locations. This should be done while prepping the partition.

 Click for more information
  • Insert the round side of the shelf pin into the partition system hole, with the flat side up.

  • Each set of (4) pins should be at the same level.

  • Ensure you are using the correct finish of pin as notated on the BOM.

If there is backing, adjustable shelves and their pins must be inserted after backing is installed.

  1. Locate the shelves in the staging area.

 Click for visuals and more information
  • Double check the measurements on the BOM and label to ensure the correct sizes are being placed in the correct location(s).

  1. Inspect the shelf for chips or damage, and touch up any chips.

 Click for more information
  • Inspect the shelf prior to removing the sticker in case the shelf needs to be replaced due to damage.

  1. Place shelf on the shelf pins.

 Click for visuals

Back to top


Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix

Back to top


Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.

Back to top


Certification Steps:

  1. Proper shelf pins have been used.

  2. Shelf has been inspected for chips or damage, and repaired if needed (See Touch Ups)

  3. Shelf has been put in the correct location according to system elevations.

Back to top


Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Click here to submit your own tip from the field.

Back to top


Terms & Definitions

BOM

Bill of Materials; Parts List

Elevation

The CAD Design Plan created by the Design Consultant with the client.

Back to top


BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

SA

Shelf Adjustable

LSA

Ecodomo Leather Adjustable Shelf

LSAR

HH Leather Adjustable Shelf

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.