Jr. Apprentice to Apprentice Installer
This page explains the steps to take for installing TAG Engage Slides and all applicable inserts/accessories in the Engage collection. This includes the Jewelry Drawer, Shoe Organizer. Prior to beginning the installation, ensure you have completed all steps of installing the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Slide Installation Steps
Divided Deep Drawer
Divided Shelf
Folding Station
Jewelry Organizer
Laundry Organizer
Lingerie Drawer
Pant Organizer
Shoe Organizer
Related Training Materials
Final Steps & Delivery
Tips from the Field
Terms & Definitions
BOM Codes
Types of Installation: Off-the-Floor, Floor-Based
Installer Level Required: Jr. Apprentice Installer
Products Required: TFL Material, Accessories
Drill Driver/Impact Drill
Accessory Options
Divided Deep Drawer
Divided Shelf
Folding Station
Jewelry Organizer
Laundry Organizer
Lingerie Drawer
Pant Organizer
Shoe Organizer
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Press on each corner of the frame to ensure it is level.
Mount slides to System 32 holes on each partition using the provided screws. Refer to the system’s elevation for the mounting height.
When not extended, the front of the slides should sit close to flush with the front of the partition.
Slide black plastic clips to the front of each runner.
Place the rear of the frame onto the slides and push them toward the back at an angle into the rear slot. Press the front of the frame down, snapping the frame onto the slide arms.
Click black clips into the front of the frame’s track.
Install accessory. Select the appropriate accessory below for insertion instructions.
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Click here to submit your own tip from the field.
BOM | Bill of Materials; parts list |
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
System 32 | The lines on the edge of each par show where the System 32 bore holes are. |
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
EN | Tag Engage Systems |
ENF | Tag Engage Face |
TEA | Engage Pant Organizers |
TEB | Engage Pull Out Shelf |
TEC | Engage Lingerie Drawer |
TED | Engage Deep Divided Basket |
TEE | Engage Laundry Organizers |
TEF | Engage Pull Out Shoe |
TEG | Engage Storage Box |
TEH | Engage Folding Station |
TEI | Engage Lingerie Divider |
TEJ | Engage Deep Divider |
TEK | Engage Jewellery Organizer |
TEL | Engage Acessory Divider |
TEM | Engage Laundry Hamper |
TEN | Engage Pant Rack with Hangers |
TEO | Engage Base |
TEP | Engage Edge |
TEQ | Engage Adapter |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.