The purpose of this page is to outline to the process of installing or attaching multiple office accessories, including keyboard trays, marker boards, tack boards, and monitor mounts magnetic marker boards and fabric/tack boards. If you are installing a non-magnetic marker board, review the press-in panel instructions.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Keyboard Trays
Marker Boards
Tack Boards
Monitor Mounts
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Anchor | ||||
---|---|---|---|---|
|
Installer Level Required: Journeyman Installer
Products Required: Accessories, Special Order
Anchor | ||||
---|---|---|---|---|
|
Drill Driver/Impact Drill
Screw Driver
Tape Measure
1/2” Drill Bit
18-Gauge Nail Gun
Liquid Nails
4' Level
Stud Finder
Hardware Required
18-Gauge 1 1/4” Nails
Toggle Bolts
2 1/2” Screws
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Personal Protective Equipment (PPE) must beworn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance. |
Review the provided template or instructions for mounting.
Mark your holes and drill for the tray, if applicable.
Mount the keyboard tray to the shelf or component.
. |
Marker Boards
Anchor | ||||
---|---|---|---|---|
|
Marker bords usually have an aluminum “z” cleat on the back side and there are usually 2 of them. Figure out where you want the board to be and mark the bottom. Make a mark. Now on the back side of the board tape the “z” cleats together if they aren’t already. Now measure from the bottom up to the bottom of both or more “z” cleats. Transfer those marks to the wall, and with a level draw out the lines. remove the tape on the “z” cleat so that they separate. One will come off and the other will be attached. Take the one that came off and Line up the bottom of the “z” cleat with the lines you just made and find your studs. Mark them out on the “z” cleat. If there are no studs or just need to use a toggle make sure that the bolt you are going to use isn’t so big that it interferes with the install. If it is going to you will have to use an easy anchor instead. Drill out your holes in the “z” cleat. Drill out and add any anchors to the wall that are needed. Now put the “z” cleat back on the wall and anchor them to it. Now grab the board and get raise it about 6 inches higher than it should go. Press it to the wall and bring it down until it slides into the “z” cleat. Give it a strong push down to make sure that it goes all the way in. add any accessories and make sure it is clean for delivery.
***just for reference when I say board it is actually glass
Determine the height of the board based on the elevation. If this is not noted, reach out to the design consultant.
On the board, measure from top of the panel down to the center of the pre-drilled hole in the bottom z-cleat. Note this measurement on a piece of paper.
Repeat taking this measurement for the bottom z-cleat. Note this measurement on a piece of paper.
Remove tape to separate the pieces of the Z cleat and remove bottom track
Measure from floor to elevation’s indicated height of the accessory.
Referring to your noted measurements, mark both cleat measurements on the wall.
Draw a level line for both bottom cleats.
Place the bottom cleat on the wall, with the line centered on the holes.
Determine location of studs for securement points. Drill for any toggles using a 1/2” drill bit.
All holes on the cleat should be used for securement. At least 2 studs should be hit for securement.
Secure using 2 1/2” screws and toggles through all holes on the bottom cleats.
Hook the board onto the bottom cleats.
Fabric/Tack Boards
Anchor | ||||
---|---|---|---|---|
|
Complete the full installation of the adjacent or surrounding system.
Measure the area for the board to ensure the tack board will fit.
Place circle circles of liquid nails on the back of the tack board; one in each corner.
Place the tack board on the wall and hold in place.
Secure in place using 1 1/4” nails. Ensure they sit below the fabric so they are not seen.
Open the box and grab the instructions grab a drill bit if it needed based on what they say. Follow the instructions to mount the mount. Once complete if the customer has the monitors go ahead and mount them but if they don’t have them or they prefer to do it them selves then leave the instructions behind for them
Anchor | ||||
---|---|---|---|---|
|
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
Anchor | ||||
---|---|---|---|---|
|
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and deliveringthe final product.
Anchor | ||||
---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Certification Steps: Marker Board
Fabric Board
|
Anchor | ||||
---|---|---|---|---|
|
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
Click here to submit your own tip from the field.
Anchor | ||||
---|---|---|---|---|
|
BOM | Bill of Materials; parts list |
Anchor | ||||
---|---|---|---|---|
|
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
Text Note | Standardized Magnetic Markerboard |
Text Note | Leather Desk BlotterFabric Board |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.