Journeyman to Senior Installer

IN REVIEW

The purpose of this page is to outline instructions and considerations when installing all items related to a desk or home office set up.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Acrylic Dividers
Blotter
Deluxe Sit-to-Stand
Double Monitor Mount
File Drawer Frame
Keyboard Tray
Mini Pencil Drawer
Single Monitor Mount
Sit-to-Stand Workstation
Standard Sit-to-Stand
Table Legs
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes


Types of Installation: Floor-Based, Wall Bed

Installer Level Required: Journeyman Installer

Products Required: TFL Material, Accessories, Special Order

Back to top


Tools Required

image-20241121-134508.png

Drill Driver/Impact Drill

image-20241121-134527.png

Tape Measure

Hardware Required

image-20241126-154111.png

Acrylic Dividers

image-20241126-154140.png

Blotter

image-20241126-154157.png

Deluxe Sit-To-Stand
Richelieu: 50078290

image-20241126-154441.png

Double Monitor Arm
Richelieu: 500FP2290

image-20241126-154247.png

File Drawer Frame
Hafele: 422.74

image-20241126-154335.png

Keyboard Tray
Richelieu: 500848290

image-20241126-154357.png

Mini Pencil Drawer
Richelieu: 89320090

image-20241126-154220.png

Single Monitor Arm
Richelieu: 500FP1190

image-20241126-154507.png

Sit-to-Stand Workstation
Richelieu: 500S2S001R90

image-20241126-154527.png

Standard Sit-to-Stand
Richelieu: 50072L2S90

image-20241126-154615.png

Table Legs
Richelieu

image-20241121-134349.png

3/4” Screws

image-20241121-134436.png

1/4” Washer

Back to top


Instructions & Considerations

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

Acrylic Dividers

If the accessory is a tray: Place the tray in its indicated location, as noted on the elevation.

If the accessory is being placed in a drawer:

  1. If Provided: Place the bottom pad in place.

  2. Place the horizontal and vertical dividers in their indicated orientation.

    1. If the dividers are only front-to-back, adhere the divider slides to the front and back from the drawer box. Slide the dividers into the slots.

Blotter

  1. Place in position according to the text note on the elevation.

  2. Ensure it is correct side up (texture/design side facing up).

  3. Explain to the customer they can clean the blotter with a slightly damp cloth, or a standard shoe polish for surface scratches/marks.

Back to top

Deluxe Sit-To-Stand 

Refer to the instructions provided by Richelieu

Considerations:

  • Using the provided instructions, confirm you have all parts and pieces

  • The table base should be centered on the countertop.

  • Leave a minimum 0.5” overhang from the side edge to the leg frame.

  • Refer to pages 6 and 7 in the Richelieu manual (linked above) for programming instructions.

  • Programming notes should be included from the designer. If they are not:

    • Program 1: 30”

    • Program 2: 36”

    • Program 3: 42”

    • Program 4: 48”

  • Leave programming instructions with the customer for future modifications.

Be aware of when a team lift is necessary based on the countertop size and weight.

Double Monitor Arm

Clamp-Mount: Refer to the instructions provided by Richelieu

In-Surface Instructions to be sent from Richelieu

Considerations:

  • Using the provided instructions, confirm you have all parts and pieces

  • If there is a modesty panel, the clamp-mount arm cannot be installed. Contact the design consultant if you encounter this situation.

  • Demonstrate the adjustability to the customer.

  • California Closets does not install monitors to monitor arms.

Back to top

File Drawer

  1. Install the drawer according to standard process.

  2. Demonstrate the file drawer system and its adjustability to the customer and, if applicable, encourage them to place a file folder inside.

Keyboard Tray

Refer to the instructions provided by Richelieu

Considerations:

Mini Pencil Drawer

Refer to the instructions provided by Richelieu

Back to top

Single Monitor Arm

Clamp-Mount: Refer to the instructions provided by Richelieu

In-Surface Instructions to be sent from Richelieu (coming)

Considerations:

  • Using the provided instructions, confirm you have all parts and pieces

  • If there is a modesty panel, the clamp-mount arm cannot be installed. Contact the design consultant if you encounter this situation.

  • Demonstrate the adjustability to the customer.

  • California Closets does not install monitors to monitor arms.

Sit-To-Stand Workstation

Refer to the instructions provided by Richelieu

  1. Using the provided instructions, confirm you have all parts and pieces

  2. If Applicable: Assemble pieces out of the box.

  3. Place on the desk in the location indicated on the elevation.

  4. Place the cable wrap on the desk for the customer to use.

  5. Demonstrate how to use the cable wrap to the customer.

  6. Demonstrate lifting and lowering the workstation.

  7. Leave instructions behind for the customer’s use.

Back to top

Standard Sit-To-Stand      

Refer to the instructions provided by Richelieu

Considerations:

  • Using the provided instructions, confirm you have all parts and pieces

  • The table base should be centered on the countertop.

  • Leave a minimum 0.5” overhang from the side edge to the leg frame.

Be aware of when a team lift is necessary based on the countertop size and weight.

Table Legs

  1. Using the provided instructions, confirm you have all parts and pieces

  2. Place the countertop top side down on the floor. Use a drop cloth to protect the countertop.

  3. Place legs in position on bottom of countertop

  4. Mount using 3/4” screw and, if applicable, 1/4” washer

    1. Round/Square Table Legs: Secure through all holes

    2. X-Shaped Table Legs: Secure through at least 4 holes

    3. U-Shaped Table Legs: Secure through all holes

Be aware of when a team lift is necessary based on the countertop size and weight.

Back to top


Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form

Back to top


Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.

Back to top


Certification Steps:

Acrylic Dividers

  1. Pieces are inspected for cracks or damage.

  2. All pieces have been used and inserted into each other correctly.

  3. Accessory fits in drawer space.

  4. If Applicable: Velvet liner inserted at the bottom of the drawer.

Deluxe Sit-to-Stand

  1. Desk works by moving up or down when pushing the buttons

  2. The countertop has been centered on the legs to create equal balance.

  3. Cords have been tucked away according to cable management practices.

Double Monitor Mount

  1. Clamp: The clamp has been tightened.

  2. In-Surface Mount: The hardware has been installed and is secured.

  3. The mount functions and has space to move around.

  4. The Allen key has been left for the customer.

  5. The mount has been demonstrated to the customer.

Keyboard Tray

  1. The tray pulls in and out as designed.

  2. All securement points have been used.

  3. The customer has been educated on how to use the accessory.

Mini Pencil Drawer

  1. The pencil drawer pulls in and out as designed.

  2. All securement points have been used.

  3. The customer has been educated on how to use the accessory

Single Monitor Mount

  1. Clamp: The clamp has been tightened.

  2. In-Surface Mount: The hardware has been installed and is secured.

  3. The mount functions and has space to move around.

  4. The Allen key has been left for the customer.

  5. The mount has been demonstrated to the customer.

Sit-to-Stand Workstation

  1. The unit is sitting firmly and level on the desk space.

  1. The up and down movement is functional and smooth.

  1. Any moving trays or work surfaces function properly and smooth.

  2. The workstation has been demonstrated to the customer.

Standard Sit-to-Stand

  1. The desk works by moving up or down when pushing the buttons.

  1. The countertop has been centered on the legs to create equal balance.

  1. Cords have been tucked away according to cable management practices.

Table Legs

Back to top


Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Click here to submit your own tip from the field.

Back to top


Terms & Definitions

BOM

Bill of Materials; parts list

Elevation

The CAD Design Plan created by the Design Consultant with the client.

Back to top


BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

CTL

Countertop Leg

STSB

Sit To Stand Base

STST

Sit To Stand Table

Text Note

A text note will be included on the elevation to indicate any grommet’s location

TT

Table Top

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.