Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Version History

« Previous Version 13 Next »

Table of Contents
Apprentice to Journeyman Installer

Table of Contents
Apprentice to Journeyman Installer

LIVE

This page explains the steps to take for installing a long supported shelf. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.

Page Contents

Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
BOM Codes


Types of Installation: Off-the-Floor, Floor-Based

Installer Level Required: Apprentice Installer

Products Required: TFL Material, Special Order

Back to top


Tools Required

Drill Driver/Impact Drill

image-20240223-151257.png

Rubber Mallet

image-20240223-151322.png

Stud Finder

Hardware Required

image-20240223-151424.png

#8 x 1 1/4” Screws

image-20240223-151442.png

#8 x 3” Screws

image-20240223-151507.png

Rafix Screw

image-20240223-151713.png

Press-In-Backing Snap Cams

Adjustable Shelf Pins

image-20240301-152252.png

Glass Shelf Pins (RI CP58406140)
Option 1

haefele-bodentraeger-fuer-holz-oder-glas-zum-einstecken-in-5mm-bohrloch-stahl-verzinkt-mit-kunststoffkappe_clipped_rev_1-20240530-211127.png

Glass Shelf Pins (HA 281.41.907)
Option 2

Back to top


Title

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

  1. Ensure you have all parts and pieces:

    1. Top press-in-backing piece.

    2. Bottom press-in-backing piece.

    3. Long supported shelf.

    4. Hidden support cleat.

If you are installing multiple long support shelves, start with the lowest and work bottom to top.

  1. Ensure all rafix pins are in place for the press-in-backing and snap cams are in place on the backing pieces. This should be done will prepping the partition.

  2. Install the bottom backing piece and the hidden support cleat together.

 Click to view visuals and more information
  • Screw the hidden cleats to the bottom piece of backing with at least 2 inches of cleat showing above the backing.

  • This is to provide support for both backing pieces and to create a slotted support for the shelf piece.

image-20240223-152556.pngimage-20240603-205207.png

  1. Install the bottom piece of press-in-backing and ensure it is secure with the cleat on the top side of the backing. The cleat should be pressed against the wall.

 Click to view visuals
image-20240603-205256.png

  1. Attach the cleat to the wall.

 Click to view visuals and more information
  • Locate studs behind the cleat and attach it to the wall by driving 3” screws through the cleat into the studs.

  • Ensure the screws are in a location high enough that the top piece of backing will cover them.

image-20240603-205326.png

  1. Ensure the appropriate shelf pins (refer to adjustable shelf and adjustable glass shelf process instructions) are in the partitions and set the shelf on top. Push the shelf back until it is pressed against the cleat.

 Click to view visuals
image-20240603-205404.png

  1. Install the top piece of backing and press into place. It should be tight to the shelf.

 Click to view visuals
image-20240603-205456.png

  1. Repeat the process as needed for additional shelves.

Back to top


Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix

Back to top


Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.

Back to top


Certification Steps:

  1. All screws in the support cleat are concealed by backing pieces.

  2. The shelf is placed between both backing pieces.

  3. Backing pieces are installed and fit tight to the shelf.

  4. Top and bottom backing pieces are aligned at the same depth.

Back to top


Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Click here to submit your own tip from the field.

Back to top


BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

BS

Backing Support Cleat

GSS

Hidden Cleat

LGS

Supported Glass Shelf

LSLS

Long Supported Leather Shelf

LSTS

Long Supported TFL Shelf

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Back to top

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.