Adjustable Glass Shelves

Table of Contents
Jr. Apprentice to Apprentice Installer

LIVE

This page explains the steps to take for installing adjustable glass shelves. Prior to beginning the installation, ensure you completed all steps of installing the system skeleton.

 

Page Contents


Types of Installation: Off-the-Floor, Floor-Based

Installer Level Required: Jr. Apprentice Installer

Products Required: TFL Material


Hardware Required

image-20240301-152227.png

Glass Shelf Pins (RI CP58406140)
Option 1

haefele-bodentraeger-fuer-holz-oder-glas-zum-einstecken-in-5mm-bohrloch-stahl-verzinkt-mit-kunststoffkappe_clipped_rev_1-20240530-211127.png

Glass Shelf Pins (HA 281.41.907)
Option 2

 


Installation Steps

Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.

 

  1. Ensure the adjustable shelf pins are in the partitions in the correct locations. This should be done while prepping the partition.

If there is backing, adjustable shelves and their pins must be inserted after backing is installed.

  1. Locate the shelves in the staging area.

  • Double check the measurements on the BOM and label to ensure the correct sizes are being placed in the correct location(s).

  1. Inspect the shelf for chips or damage.

  • If the shelf is chipped or damage, notify the shop/warehouse as soon as possible for a replacement.

  1. Place shelf on the shelf pins.


Related Training Materials

Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix


Final Steps & Delivery

  1. Inspect the installation and complete any touch ups if necessary.

  2. If there are no more components to install, remove all stickers/labels.

  3. If there are no more components to install, complete the clean up process.

  4. If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.


Certification Steps:

  1. Proper shelf pins have been used.

  2. Shelf has been inspected for chips or damage, and communicated for replacement if needed.

  3. Shelf has been put in the correct location according to system elevation.


Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.

Click here to submit your own tip from the field.


Terms & Definitions

BOM

Bill of Materials; Parts List

Elevation

The CAD Design Plan created by the Design Consultant with the client.


BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.

GS

Glass Shelf

The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.

Questions? Please e-mail Aleeshya Broome (albroome@calclosets.com)