/
CC Nonconformance

CC Nonconformance

Nonconformance can be done on its own. It also can be done if you have damaged material i.e. someone rolls over it with the lift. It can be done within a job. You can non-conform operations and sub-contracts.

Follow the path: Xmc>Production Management>Quality Assurance>General Operations>Nonconformance

 

Image Quality 1

The screen below will appear.

 

Image Quality 2

 

NOTE: if there were nonconforming items in the system, they would show up in a tree view in the left hand panel of the screen.  It would be broken down to materials, subcontract, etc. Material is referencing job material. It is NOT inventory.

  1. Click on New>New Inventory

  2. Enter Employee ID

  3. Enter Part Number

  4. Enter Quantity

  5. Enter Reason

  6. Uncheck the Request Move

  7. Confirm Warehouse

  8. Confirm To Warehouse

  

Image Quality 3

 NOTE: Employee needs to be populated.

 

  1. Enter the Bin Location. Click on the Bin field to pull up Search options.

Image Quality 4

 

  1. Save once all fields have been entered

Image Quality 5

 

Once saved a screen will appear with the Transaction ID; at this point close out of the screen.

Image Quality 6

Related content

Information about navigating the Epicor ERP application

*For a basic quote-to-cash scenario that’s only 36 pages, System Flow education doc is here on SharePoint. 
*The rest of the Education documents are good guides to basic Epicor functionality.