This page explains the steps to take for installing door hinges and door faces. Prior to beginning the installation, ensure you have completed all steps of installing the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Hinge Reference Guide
Related Training Materials
Final Steps & Delivery
Certification Steps
Tips from the Field
Terms & Definitions
BOM Codes
Types of Installation: Off-the-Floor, Floor-Based, Virtuoso, Wall Bed
Installer Level Required: Apprentice Installer
Products Required: TFL Material, Accessories, Special Order
Drill Driver/Impact Driver
Pozi #2 Screw Driver
Hardware Required
Hinge Jig (Optional)
9mm Euro Screw (Optional)
Hinge
Hinge Mounting Plate
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Locate hinges and hinge mounting plates; there should be equal numbers of each. Ensure you have the correct hinges for the overlay indicated on the elevation.
Mount the plates on the partitions using the included screws in the location that corresponds with the hinge placement holes on the door.
If using metal doors, attach the hinge following manufacturer guidelines.
Mount the hinges on the doors.
For Element Aluminum frame doors, ensure you are including the decorative cups when mounting the hinges on the doors.
Install the door.
Flip-Up Doors Only: Install Lid Stay hardware
Adjust the hinges so the door is in-line with adjacent doors and drawers.
Install handle or knob. Refer to the decorative hardware guide for hardware specifications.
Test functionality.
Full Overlay
Half Overlay
Inset
Skeleton Fundamentals
Complete the Installation
Decorative Hardware Guide
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Click here to submit your own tip from the field.
BOM | Bill of Materials; Parts List |
Elevation | The CAD Design Plan created by the Design Consultant with the client. |
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
DIV | Divider |
DST | Inset Door Stop |
HDR | Hinged Door |
HIN | Hinge |
HL | Handle |
HPI | Flip Up/Down Hardware |
HWI | HH Flip Down Hardware |
INS | Insert |
PRO | Profile |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.