Trash Bins
Table of Contents
Apprentice to Journeyman Installer
The purpose of this page is to outline the process of installing pull out trash bins. Prior to beginning this process, ensure you have completed the system skeleton.
Page Contents
Skill Requirements
Tools & Hardware
Installation Steps
Related Training Materials
Final Steps & Delivery
Certification
Tips from the Field
Terms & Definitions
BOM Codes
Types of Installation: Off-the-Floor, Floor-Based, Wall Bed
Installer Level Required: Apprentice Installer
Products Required: TFL Material, Accessories, Special Order
Drill Driver/Impact Drill
Screw Driver
Tape Measure
Personal Protective Equipment (PPE) must be worn at all times when handling material and operating the power tools mentioned throughout this process. Review the PPE Matrix for further guidance.
Ensure you have all parts.
Review the provided hardware directions and make any markings as indicated.
Mount the hardware to the bottom fixed shelf according to the provided directions.
Place the drawer into the hardware.
Mount the door.
Mount the handle or knob to the door.
Insert the garbage can(s) into the cutouts in the drawer.
Ensure functionality by opening and closing the door a few times to ensure there is no rubbing.
Skeleton Fundamentals
Complete the Installation
System Touch Ups
Cleaning the System & Jobsite
Delivery to the Customer
PPE Matrix
Product Feedback Form
Inspect the installation and complete any touch ups if necessary.
If there are no more components to install, remove all stickers/labels.
If there are no more components to install, complete the clean up process.
If there are no more components to install, complete the Professional Installation Experience by walking through the space with the customer and delivering the final product.
Certification Steps:
Trash can door opens and closes without rubbing or interfering with the surrounding component.
Door opens and closes with ease.
Door opens far enough to allow bag or basket to come out.
Tips from the Field
Tips submitted by fellow installers and leaders in the field. These optional tips are intended to make this install process simpler.
Click here to submit your own tip from the field.
BOM | Bill of Materials; parts list |
BOM Codes
The purpose of this section is to provide guidance when confirming details on the BOM. This list includes all individual parts typically associated with this process.
RCB | Recycling Bin |
TTB | Tilt Out Trash Bin |
The codes in the table above are directly from the Corporate CAD database and may not reflect all codes included in the Supported Franchise Database or Independent Franchise Databases.