CC Releasing Orders
This process takes place outside of Epicor.
After Pre-production planners have run the orders through Order Job Wizard; the following steps will take place (outside of Epicor):
Orders will be run through WoodCADCAM and Cutright
Often times, multiple order will be run during the same time into Cutright
The paperwork will go back to the Production Planning Manger
The Production Planning Manger releases the orders
The Production Planning Manger creates the deadline report (manual report) NEED Documenting Deadline Report
The Production Planning Manger provides a deadline report to the team on the floor
Example Image of Deadline Report
Image Opportunity-Quote 31
NOTE: carts have markers and are color coordinated. Each color with have one Cutright report. Two pre-pro guys that pull the TARs to CAD (2 at WMC and 2 at EMC). This is an automatic process.Color coding is a FIFO process.
Related content
Information about navigating the Epicor ERP application
*For a basic quote-to-cash scenario that’s only 36 pages, System Flow education doc is here on SharePoint.
*The rest of the Education documents are good guides to basic Epicor functionality.